10-year framework will support major UK water, wastewater and coastal improvement projects.
Jacobs (NYSE: J) has been selected as a key supply partner for the VolkerFitzpatrick and VolkerStevin joint venture, which has secured a place on Anglian Water’s Major Projects Framework for Asset Management Periods 8 and 9 (AMP8/9).
Anglian Water estimates the 10-year framework at $2 billion (£1.5 billion), which will be spread across two contracts. It will provide capacity for major water and wastewater projects across the region, with initial work including coastal water quality improvements.
The framework’s initial work is organized into two portfolios. Green-First Urban projects will use sustainable drainage systems (SuDS) and green infrastructure to reduce storm overflow spills, support flood resilience and improve public spaces. Coastal Waters Quality Improvement projects will combine stormwater storage, overflow reductions and wastewater treatment upgrades to improve water quality at bathing and shellfish waters.
The Jacobs, VolkerFitzpatrick and VolkerStevin team will bring together process, civil, mechanical, electrical and control systems, and SuDS capabilities. Expected scope includes early contractor involvement, detailed design, construction and commissioning. The wider framework is anticipated to support additional major investments toward the end of AMP8 and through AMP9, as programme needs develop.
Jacobs Executive Vice President Richard Sanderson said: “We’ve built a strong track record with VolkerStevin and VolkerFitzpatrick over several years, and that experience is central to how we’ll approach this framework. Leading our work from our Peterborough office keeps us close to local priorities and we look forward to bringing the right technical disciplines around each project to improve water quality and strengthen resilience across the region.”
VolkerWessels U.K. Board Director James Hindes said: “Securing a place on this framework is a fantastic opportunity for our team and further strengthens our relationship with Jacobs. By combining our experience and expertise, we look forward to working collaboratively with Anglian Water to deliver important infrastructure that will improve water quality and strengthen resilience for communities across the region.”
Consistently ranked among the top design firms in water and wastewater treatment by Engineering News-Record, Jacobs works across the full water cycle to protect water quality, strengthen resilience and safeguard the environment. Its global experience includes some of the largest water re-use projects, including the award-winning Donald C. Tillman Advanced Water Purification Facility in the U.S., Auckland’s Central Interceptor, New Zealand’s largest-ever wastewater project, and the U.K.’s Sidmouth Amphitheatre Flood Alleviation Scheme. In the U.K., Jacobs and VolkerStevin also work together as C2V, appointed Construction Delivery Partner for United Utilities’ £3 billion, five-year capital programme to modernize water and wastewater infrastructure in Northwest England.
At Jacobs, we’re challenging today to reinvent tomorrow – delivering outcomes and solutions for the world’s most complex challenges. With approximately $12 billion in annual revenue and a team of approximately 47,000, we provide end-to-end services in advanced manufacturing, cities & places, energy, environmental, life sciences, transportation and water. From advisory and consulting, feasibility, planning, design, programme and lifecycle management, we’re creating a more connected and sustainable world. See how at jacobs.com and connect with us on LinkedIn, Instagram, X and Facebook.
Jacobs employs more than 6,000 people across the U.K., operating from 15 core offices and over 35 additional sites. Working with HM Government, local authorities and the private sector, Jacobs helps shape and deliver the nation’s most critical infrastructure, energy, environmental and community programmes — creating social value by improving resilience, driving economic growth and enhancing quality of life.


